Failed Blower Door Test in Massachusetts? What to Do Next
Massachusetts new homes must test at or below 3.0 air changes per hour at 50 Pa (ACH50) under the energy code, and HERS targets often push builders tighter. If a home fails, the inspector will not sign off until the leaks are found and sealed and the house is retested. Most failures come from a handful of predictable spots, so a fast fix is usually possible.
The limit
3.0 ACH50 for new homes under the Massachusetts code. Many HERS designs assume 1.5-2.0 ACH50, so a pass on code can still miss the HERS target.
Most Common Leaks We Find
- Attic hatches and pull-down stairs without gaskets.
- Top plates and wire/plumbing penetrations into the attic.
- Rim joists and sill plates in the basement.
- Recessed lights, bath fans and kitchen hoods.
- Tub and shower drains on exterior walls; fireplace and chase openings.
- Duct boots and air handler cabinets in unconditioned space.
Fix and Retest Steps
- Run the blower door in depressurization and walk the house with smoke and an infrared camera.
- Mark leaks and give the crew a punch list by priority.
- Seal with gaskets, foam, caulk and tape as appropriate.
- Retest; we report the new ACH50 for the inspector and the HERS file.
Avoid It Next Time
A pre-drywall inspection with an early blower door test catches most leaks while they are still easy to reach. See blower door testing, and for commercial buildings the commercial air leakage test.
FAQ
What is the blower door limit for new homes in Massachusetts?
3.0 air changes per hour at 50 Pa (ACH50) under the energy code; HERS designs often assume tighter.
What happens if my house fails the blower door test?
The leaks are located, sealed and the home is retested. The building inspector needs a passing result before final sign-off.
What are the most common causes of a failed test?
Attic hatches, top-plate penetrations, rim joists, recessed lights, fans and ductwork in unconditioned space.
How fast can you retest?
Usually within days once sealing is done. Call us to schedule.
Can a pre-drywall test prevent failure?
Yes. Testing before drywall lets crews seal leaks while framing and penetrations are still exposed.
Town-by-Town Permit Checklists
Local building department details, checked on each town's own website:
Sources: 225 CMR 22 (residential). Code text current as of October 2026; DOER has proposed updates to the Stretch and Specialized codes, so confirm before you file.
Related: Stretch code report for permitting · What triggers a HERS rating · REScheck and COMcheck · Phius verification
Need a Retest or Leak Hunt?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.
Last updated · Home Energy Efficiency Consultants, RESNET-certified HERS raters