REScheck & COMcheck Holden MA - Quick Facts
Local energy code in Holden
- Holden is a Stretch Code community - the statewide baseline for new construction and major renovations. IECC Climate Zone 5A.
- Massachusetts has three energy-code levels - base (2021 IECC), Stretch, and Specialized (Opt-In) - and Holden is on the Stretch Code.
REScheck & COMcheck in Holden
- REScheck documents the prescriptive residential path for Holden additions, alterations and renovations (from $300); new-construction performance projects use a full HERS energy model instead.
- Commercial projects use COMcheck for the prescriptive path (from $600); larger new commercial buildings need third-party performance certification under the Stretch Code.
- 24-48 hour turnaround - documentation ready to upload with your Holden permit application.
Mass Save rebates for Holden (2026)
- All-electric renovations and additions can earn Mass Save incentives up to $20,000 (Level 1) or $30,000 (Level 2) for a single-family home, verified by a RESNET-certified HERS rater.
RESNET-certified · 15,000+ ratings completed · 5.0 stars across 136 Google reviews · (617) 501-6788
REScheck & COMcheck Holden MA
Home Energy Efficiency Consultants prepares REScheck (residential) and COMcheck (commercial) compliance documentation for Holden projects. When your build does not trigger a full HERS rating, these DOE compliance reports are the fast, affordable path to your permit.
What we deliver
A signed compliance report matched to your plans and ready to upload with your Holden building permit application.
REScheck vs. COMcheck: What’s the Difference?
These are the two standard software tools plan reviewers accept for energy code compliance. Developed by the DOE, they let a Worcester County project demonstrate that its envelope (and, for commercial, lighting and mechanical) meets the IECC.
What is a REScheck?
REScheck is the DOE’s residential compliance tool. It covers one- and two-family dwellings and low-rise multifamily (three stories or fewer), using a UA trade-off so a stronger wall or roof can make up for a weaker window while the overall envelope still meets the IECC.
What is a COMcheck?
COMcheck handles commercial work and high-rise residential of four stories or more. The DOE tool evaluates envelope, lighting (interior and exterior), and mechanical systems against either the IECC or ASHRAE 90.1, with trade-offs allowed across components.
REScheck Projects in Holden
REScheck is the simplest path for smaller residential projects in Holden that do not need a HERS rating. It is typically the right tool for:
- New residential construction or an addition of 1,000 sq ft or less that does not require a HERS rating
- Permit applications needing residential envelope documentation on the prescriptive or UA trade-off path
- Window and insulation upgrades that must be documented for a building permit
- Finished basements, attic conversions, and dormer additions on existing homes
- Additions, alterations, or renovations to a one- or two-family home
When Do You Need a COMcheck in Holden?
COMcheck is required for commercial and larger projects in Holden. Reach for a COMcheck when your project involves:
- Warehouse, industrial, and light-manufacturing conditioned spaces
- Envelope work on commercial structures requiring IECC or ASHRAE 90.1 compliance
- High-rise residential buildings of four stories or more
- Restaurant build-outs and retail white-box improvements
- Commercial buildings — offices, retail, restaurants, warehouses, and mixed-use
Inside Your REScheck or COMcheck Report
Plans matched to code
We enter your assemblies, fenestration, and (for commercial) lighting and mechanical details exactly as designed, so the report reflects what you are actually building in Holden.
Fast, permit-ready turnaround
We deliver documentation ready to upload with your building permit application, and we answer plan-review questions if the department asks for revisions.
COMcheck report
The COMcheck Envelope, Lighting, and Mechanical Compliance Certificates plus the Plan Review Checklist — the full package a commercial plan reviewer expects for permit submission.
REScheck report
A signed REScheck compliance certificate matched to your plans, the inspection checklist, and the UA trade-off summary showing your insulation R-values and window U-factors meet the residential energy code.
Serving Holden and Worcester County
Holden sits in Worcester County, Massachusetts, in IECC climate zone 5A — the cold-climate zone that drives the insulation and air-sealing levels your REScheck or COMcheck must document. We prepare compliance reports for projects throughout Worcester County, matched to the code edition Holden currently enforces.
Transparent Pricing for Holden Compliance Reports
Transparent starting prices. Final cost depends on project size, number of assemblies, and scope.
- REScheck (residential): starting at $300
- COMcheck (commercial): starting at $600
- Revisions to match plan-review comments are handled promptly
REScheck reports start at $300 and COMcheck reports start at $600 for projects in Holden. Send your plans for an exact quote.
Trusted by Holden Builders & Owners
Google Review
“Best decision I made was hiring Home Energy Efficiency Consultants LLC. Their attention to detail and willingness to answer all my questions made the process stress-free.”
Which Energy Code Report Does a Holden Project Need?
Holden is on the Massachusetts base energy code. It has not adopted the Stretch Code (used by 241 communities) or the Specialized (Opt-In) Code (used by 61), so projects follow the base code in 225 CMR 22.00 and 23.00. We confirm Holden's current code status against the state list before we prepare any report.



| Your Holden project | What the energy code paperwork usually is |
|---|---|
| New single-family home or low-rise residential building | In Stretch Code towns, a HERS rating (maximum HERS 42 mixed-fuel, 45 all-electric) or Passive House. REScheck is not accepted for new homes under the Stretch Code. |
| Residential addition of 1,000 sq ft or less (and not over 100% of the existing home) | REScheck (REScheck-Web, 2023 Massachusetts Stretch Code) or the prescriptive tables |
| Residential addition over 1,000 sq ft or over 100% of the existing home | A HERS rating of the whole house (HERS 65 or lower mixed-fuel, 70 or lower all-electric) |
| Basement or attic conversion with no change to footprint or roofline | No HERS rating required; REScheck or prescriptive documentation |
| Residential renovation or alteration | Prescriptive alteration rules; REScheck can document the envelope. Large "extensive" alterations over 1,000 sq ft may need a HERS rating. |
| New commercial building up to 20,000 sq ft | COMcheck: Envelope, Lighting and Mechanical certificates plus the Plan Review Inspection Checklist |
| New commercial building over 20,000 sq ft | COMcheck Lighting and Mechanical, with the envelope shown by backstop and thermal-bridge calculations, on a performance path (Targeted Performance/TEDI or ASHRAE 90.1 Appendix G) or Passive House |
| Commercial addition, alteration, or lighting/HVAC change | COMcheck for the altered systems |
| Multifamily building over 12,000 sq ft | Passive House or a HERS/performance path |
Based on 225 CMR 22.00 and 23.00 (Massachusetts energy code, 2025 edition). Building departments make the final call, so we confirm the path for your project before we start. Holden is in Worcester County, served from our Marlborough (272 Lincoln St) office.
How We Prepare Your Holden REScheck or COMcheck
Send your plans
Email the permit set for your Holden project. We tell you the same day whether you need a REScheck, a COMcheck or a HERS rating.
We model the building
We enter every assembly, window, light fixture and HVAC unit as designed and flag anything that fails before the plan reviewer sees it.
Permit-ready report
You get the signed compliance certificates and checklists, ready to upload with your Holden building permit application.
Plan review support
If the building department asks for changes, we revise the report and answer the reviewer's questions.
REScheck & COMcheck for Holden Permits
Holden is on the Massachusetts base energy code. According to the state's adoption list, the town has not adopted the Stretch Code or the Specialized (Opt-In) Code. For a builder, that is the biggest difference between Holden and many towns nearby: the Stretch Code's mandatory HERS ratings for new homes do not apply here.


The Holden Building Department is in Town Hall at 1196 Main Street, within the Planning & Development Office. Building, electrical, plumbing, gas and sheet metal permits are applied for and paid online through the town's online permitting system, and the Building Department's own page links to the DOE's REScheck tool as its building energy code resource.
Choosing the right report in Holden
For a small addition or alteration, such as an addition up to 1,000 sq ft that is not more than 100% of the existing home, a REScheck documents the envelope on the prescriptive path. A new home in Holden can often be documented on the prescriptive path too, with a HERS rating still available as an option. In Stretch and Specialized towns, by comparison, new homes need HERS 42 (mixed-fuel) or 45 (all-electric), and larger renovations need HERS 65 or 70.
For commercial work, a COMcheck covers envelope, lighting and mechanical systems. The extra requirements that Stretch and Specialized towns add for commercial buildings over 20,000 sq ft do not apply in Holden.
Code status can change at Town Meeting, so we confirm Holden's status against the state list before each report. HEEC's Marlborough office at 272 Lincoln St C1 is our nearest location to Holden.
REScheck & COMcheck Questions for Holden Projects
Do I need a REScheck or a HERS rating in Holden?
Holden is on the Massachusetts base energy code, not the Stretch Code, so the Stretch Code's HERS targets for new homes (HERS 42 mixed-fuel or 45 all-electric) do not apply. REScheck is used for additions of 1,000 sq ft or less that are not over 100% of the existing home, basement and attic conversions, and renovations. We confirm Holden's code status before we start.
When is a COMcheck required in Massachusetts?
A COMcheck documents commercial energy code compliance for new commercial buildings up to 20,000 sq ft (envelope, lighting and mechanical), for lighting and mechanical on larger buildings, and for commercial additions and alterations such as fit-outs, lighting changes and HVAC replacements. Massachusetts commercial code is based on the 2021 IECC with state amendments in 225 CMR 23.00.
What does a COMcheck include?
The COMcheck Envelope Compliance Certificate, the Interior and Exterior Lighting Compliance Certificates, the Mechanical Compliance Certificate, and the Plan Review Inspection Checklist. Massachusetts 225 CMR 23.00 Section C103.2 lists these as the construction-document requirements for buildings up to 20,000 sq ft.
What does a REScheck include?
A REScheck compares your home's envelope (insulation R-values and window U-values) to the code using a total UA trade-off, so stronger performance in one assembly can offset another. The report includes the compliance certificate and inspection checklist. Mandatory items such as air sealing and duct sealing still apply.
What size addition needs a HERS rating instead of REScheck?
In Massachusetts Stretch Code and Specialized Code communities, a residential addition over 1,000 sq ft, or over 100% of the existing conditioned floor area, needs a HERS rating of the whole house (225 CMR 22.00 R502.1.1). Converting an existing basement or attic without changing the footprint or roofline does not.
What information do you need to prepare a REScheck or COMcheck?
Plans with wall, roof and floor sections, insulation types and R-values, the window and door schedule with U-factors and SHGC, and for commercial work the lighting fixture schedule with wattages, lighting controls, and HVAC and water heating equipment schedules.
Which software version is used in Massachusetts?
REScheck-Web with the 2023 Massachusetts Stretch Code option for residential, and COMcheck-Web set to the 2021 IECC (or ASHRAE 90.1-2019) for commercial, matching the code Massachusetts enforces.
How much does a REScheck or COMcheck cost in Holden?
REScheck reports start at $300 and COMcheck reports start at $600. The final price depends on the size of the project and how many assemblies and systems need to be entered. Send your plans for an exact quote.
Does Holden require a HERS rating for a new home?
Not under the energy code. Holden is on the Massachusetts base energy code, so the Stretch Code's HERS 42 / 45 targets for new homes do not apply, and a new home can often be documented on the prescriptive path. A HERS rating is still an option.
Where do I apply for a building permit in Holden?
The Holden Building Department is in Town Hall at 1196 Main Street. Building, electrical, plumbing, gas and sheet metal permits are applied for and paid through the town's online permitting system.
Related: HERS rating in Holden · Blower door testing · COMcheck & REScheck reports
Need a REScheck or COMcheck in Holden?
Send us your plans and we will tell you which report you need and get it back to you fast — ready for your Holden permit.
Email Energyconsultants01@gmail.com Call (617) 501-6788Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.
Last updated · Home Energy Efficiency Consultants, RESNET-certified HERS raters
More Massachusetts Towns We Serve
Certified HERS ratings, blower door testing and energy code compliance across all 351 Massachusetts cities and towns.








