REScheck & COMcheck Holland MA - Quick Facts
Local energy code in Holland
- Holland enforces the Massachusetts Stretch Energy Code for new construction and major renovations. IECC Climate Zone 5A.
- Massachusetts has three energy-code levels - base (2021 IECC), Stretch, and Specialized (Opt-In) - and Holland is on the Stretch Code.
REScheck & COMcheck in Holland
- REScheck documents the prescriptive residential path for Holland additions, alterations and renovations (from $300); new-construction performance projects use a full HERS energy model instead.
- Commercial projects use COMcheck for the prescriptive path (from $600); larger new commercial buildings need third-party performance certification under the Stretch Code.
- 24-48 hour turnaround - documentation ready to upload with your Holland permit application.
2026 Mass Save incentives in Holland
- All-electric renovations and additions can earn Mass Save incentives up to $20,000 (Level 1) or $30,000 (Level 2) for a single-family home, verified by a RESNET-certified HERS rater.
RESNET-certified · 15,000+ ratings completed · 5.0 stars across 136 Google reviews · (617) 501-6788
REScheck & COMcheck Holland MA
Need a REScheck or COMcheck in Holland? We produce permit-ready energy code compliance reports for homes and commercial buildings across Hampden County, matched precisely to your plans so your project clears plan review the first time.
What we deliver
A signed compliance report matched to your plans and ready to upload with your Holland building permit application.
What Is a REScheck and What Is a COMcheck?
These are the two standard software tools plan reviewers accept for energy code compliance. Developed by the DOE, they let a Hampden County project demonstrate that its envelope (and, for commercial, lighting and mechanical) meets the IECC.
What is a COMcheck?
For commercial and four-plus-story residential buildings, COMcheck is required. It documents envelope, lighting, and mechanical compliance against the IECC or ASHRAE Standard 90.1 and produces the certificates a commercial plan reviewer expects.
What is a REScheck?
REScheck is the DOE’s residential compliance tool. It covers one- and two-family dwellings and low-rise multifamily (three stories or fewer), using a UA trade-off so a stronger wall or roof can make up for a weaker window while the overall envelope still meets the IECC.
Is a REScheck Right for Your Holland Project?
REScheck is the simplest path for smaller residential projects in Holland that do not need a HERS rating. It is typically the right tool for:
- New residential construction or an addition of 1,000 sq ft or less that does not require a HERS rating
- Additions, alterations, or renovations to a one- or two-family home
- Finished basements, attic conversions, and dormer additions on existing homes
- Multifamily buildings of three stories or fewer
- Detached accessory structures with conditioned space
COMcheck Projects in Holland
COMcheck is required for commercial and larger projects in Holland. Reach for a COMcheck when your project involves:
- Tenant fit-outs and interior or exterior lighting alterations
- High-rise residential buildings of four stories or more
- Medical, dental, and professional office construction
- Commercial buildings — offices, retail, restaurants, warehouses, and mixed-use
- Warehouse, industrial, and light-manufacturing conditioned spaces
Inside Your REScheck or COMcheck Report
REScheck report
A signed REScheck compliance certificate matched to your plans, the inspection checklist, and the UA trade-off summary showing your insulation R-values and window U-factors meet the residential energy code.
Plans matched to code
We enter your assemblies, fenestration, and (for commercial) lighting and mechanical details exactly as designed, so the report reflects what you are actually building in Holland.
Fast, permit-ready turnaround
We deliver documentation ready to upload with your building permit application, and we answer plan-review questions if the department asks for revisions.
COMcheck report
The COMcheck Envelope, Lighting, and Mechanical Compliance Certificates plus the Plan Review Checklist — the full package a commercial plan reviewer expects for permit submission.
Serving Holland and Hampden County
Holland sits in Hampden County, Massachusetts, in IECC climate zone 5A — the cold-climate zone that drives the insulation and air-sealing levels your REScheck or COMcheck must document. We prepare compliance reports for projects throughout Hampden County, matched to the code edition Holland currently enforces.
What a REScheck or COMcheck Costs in Holland
Transparent starting prices. Final cost depends on project size, number of assemblies, and scope.
- REScheck (residential): starting at $300
- COMcheck (commercial): starting at $600
- Revisions to match plan-review comments are handled promptly
REScheck reports start at $300 and COMcheck reports start at $600 for projects in Holland. Send your plans for an exact quote.
Trusted by Holland Builders & Owners
Google Review
“Best decision I made was hiring Home Energy Efficiency Consultants LLC. Their attention to detail and willingness to answer all my questions made the process stress-free.”
Which Energy Code Report Does a Holland Project Need?
Holland is not one of the 60 Massachusetts communities on the Specialized Code, so projects follow the Massachusetts Stretch Code (225 CMR 22.00 and 23.00), which 242 communities have adopted, or the base energy code if Holland has not adopted the Stretch Code. We confirm Holland's current code status against the state list before we prepare any report.



| Your Holland project | What the energy code paperwork usually is |
|---|---|
| New single-family home or low-rise residential building | In Stretch Code towns, a HERS rating (maximum HERS 42 mixed-fuel, 45 all-electric) or Passive House. REScheck is not accepted for new homes under the Stretch Code. |
| Residential addition of 1,000 sq ft or less (and not over 100% of the existing home) | REScheck (REScheck-Web, 2023 Massachusetts Stretch Code) or the prescriptive tables |
| Residential addition over 1,000 sq ft or over 100% of the existing home | A HERS rating of the whole house (HERS 65 or lower mixed-fuel, 70 or lower all-electric) |
| Basement or attic conversion with no change to footprint or roofline | No HERS rating required; REScheck or prescriptive documentation |
| Residential renovation or alteration | Prescriptive alteration rules; REScheck can document the envelope. Large "extensive" alterations over 1,000 sq ft may need a HERS rating. |
| New commercial building up to 20,000 sq ft | COMcheck: Envelope, Lighting and Mechanical certificates plus the Plan Review Inspection Checklist |
| New commercial building over 20,000 sq ft | COMcheck Lighting and Mechanical, with the envelope shown by backstop and thermal-bridge calculations, on a performance path (Targeted Performance/TEDI or ASHRAE 90.1 Appendix G) or Passive House |
| Commercial addition, alteration, or lighting/HVAC change | COMcheck for the altered systems |
| Multifamily building over 12,000 sq ft | Passive House or a HERS/performance path |
Based on 225 CMR 22.00 and 23.00 (Massachusetts energy code, 2025 edition). Building departments make the final call, so we confirm the path for your project before we start. Holland is in Hampden County, served from our Marlborough (272 Lincoln St) office.
How We Prepare Your Holland REScheck or COMcheck
Send your plans
Email the permit set for your Holland project. We tell you the same day whether you need a REScheck, a COMcheck or a HERS rating.
We model the building
We enter every assembly, window, light fixture and HVAC unit as designed and flag anything that fails before the plan reviewer sees it.
Permit-ready report
You get the signed compliance certificates and checklists, ready to upload with your Holland building permit application.
Plan review support
If the building department asks for changes, we revise the report and answer the reviewer's questions.
REScheck & COMcheck Questions for Holland Projects
Do I need a REScheck or a HERS rating in Holland?
Under the Massachusetts Stretch Code, new homes need a HERS rating (HERS 42 mixed-fuel or 45 all-electric) or Passive House. REScheck is used for additions of 1,000 sq ft or less that are not over 100% of the existing home, basement and attic conversions, and renovations. We confirm Holland's code status before we start.
When is a COMcheck required in Massachusetts?
A COMcheck documents commercial energy code compliance for new commercial buildings up to 20,000 sq ft (envelope, lighting and mechanical), for lighting and mechanical on larger buildings, and for commercial additions and alterations such as fit-outs, lighting changes and HVAC replacements. Massachusetts commercial code is based on the 2021 IECC with state amendments in 225 CMR 23.00.
What does a COMcheck include?
The COMcheck Envelope Compliance Certificate, the Interior and Exterior Lighting Compliance Certificates, the Mechanical Compliance Certificate, and the Plan Review Inspection Checklist. Massachusetts 225 CMR 23.00 Section C103.2 lists these as the construction-document requirements for buildings up to 20,000 sq ft.
What does a REScheck include?
A REScheck compares your home's envelope (insulation R-values and window U-values) to the code using a total UA trade-off, so stronger performance in one assembly can offset another. The report includes the compliance certificate and inspection checklist. Mandatory items such as air sealing and duct sealing still apply.
What size addition needs a HERS rating instead of REScheck?
In Massachusetts, a residential addition over 1,000 sq ft, or over 100% of the existing conditioned floor area, needs a HERS rating of the whole house (225 CMR 22.00 R502.1.1). Converting an existing basement or attic without changing the footprint or roofline does not.
What information do you need to prepare a REScheck or COMcheck?
Plans with wall, roof and floor sections, insulation types and R-values, the window and door schedule with U-factors and SHGC, and for commercial work the lighting fixture schedule with wattages, lighting controls, and HVAC and water heating equipment schedules.
Which software version is used in Massachusetts?
REScheck-Web with the 2023 Massachusetts Stretch Code option for residential, and COMcheck-Web set to the 2021 IECC (or ASHRAE 90.1-2019) for commercial, matching the code Massachusetts enforces.
How much does a REScheck or COMcheck cost in Holland?
REScheck reports start at $300 and COMcheck reports start at $600. The final price depends on the size of the project and how many assemblies and systems need to be entered. Send your plans for an exact quote.
Related: HERS rating in Holland · Blower door testing · COMcheck & REScheck reports
Need a REScheck or COMcheck in Holland?
Send us your plans and we will tell you which report you need and get it back to you fast — ready for your Holland permit.
Email Energyconsultants01@gmail.com Call 617-501-6788Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.
HERS Ratings in Holland, Massachusetts
Home Energy Efficiency Consultants provides Holland with certified HERS ratings, blower door and duct leakage testing, and Massachusetts energy-code compliance for new construction, additions, and major renovations — with same-day preliminary reports.
We rate homes across the Commonwealth from our four offices. Reach the one nearest your Holland project — Somerville, Framingham, Marlborough, or Everett — or call (617) 501-6788 to schedule a Holland rating.
More Massachusetts Towns We Serve
Certified HERS ratings, blower door testing and energy code compliance across all 351 Massachusetts cities and towns.








