What You Need for a Building Permit in Arlington, MA
To get a building permit in Arlington, apply to the Inspectional Services Department through Arlington Online Permitting. For a new home or addition you will usually need the application, scaled plans, a surveyor's plot plan, contractor license and insurance paperwork (or a homeowner exemption), a workers' comp affidavit and energy code documentation. Arlington follows the Specialized (Opt-In) Energy Code, so new homes and large additions also need a projected HERS rating report from a RESNET-certified rater at permit and a confirmed HERS rating before the certificate of occupancy.
Arlington building department
Inspectional Services Department
51 Grove Street, 1st Floor, Arlington, MA 02476
781-316-3392
Apply: Arlington Online Permitting (OpenGov ViewPoint)
Arlington Building Permit Checklist
What Arlington asks for on a new home, addition or major renovation, from the Arlington permit pages. Bring all of it the first time and the review moves faster.
- Building Permit - One or Two-Family Dwelling (online)
- Plot plan stamped by a Registered Land Surveyor for new structures, additions, decks, sheds and pools
- Good Neighbor Agreement and Residential Construction Notification (abutters within 200 ft) for new homes, demolition and additions over 750 sq ft or 50% of floor area
- Major Stormwater Management Permit if the project adds 350+ sq ft of impervious area ($300)
- Dumpster/Pod Permit (no dumpsters on the street) and Workers' Compensation Affidavit
- Energy code documentation; new homes must be all-electric under the Fossil Fuel Free bylaw

Who Can Apply and How
A homeowner can do work on their own 1-2 family home without a license, but must supervise and attend all inspections. Otherwise a licensed contractor applies.
Apply through Arlington Online Permitting (OpenGov ViewPoint). Questions go to the Inspectional Services Department at 781-316-3392.
Energy Code Compliance: The Part That Holds Up Most Permits
Arlington's Specialized Code took effect January 1, 2024.
At permit: New homes and large additions need a projected HERS rating. Arlington's Fossil Fuel Free bylaw (May 21, 2024) bars the Zero Energy and Mixed-Fuel paths for new construction. A zoning exemption lets some nonconforming lots skip frontage and lot area minimums if the home reaches HERS 44 or lower.
At final: At final we run the blower door and duct leakage tests and issue the confirmed HERS certificate.
| Project | Energy document |
|---|---|
| New home | Projected HERS report (HERS 42 mixed-fuel / 45 all-electric) |
| ADU | Projected HERS report (HERS 52 / 55) |
| Addition over 1,000 sq ft or over 100% of the home | Projected HERS report (HERS 65 / 70) |
| Smaller addition or alteration | REScheck or the prescriptive path, if the inspector accepts it |
| Commercial up to 20,000 sq ft | COMcheck plus a whole-building blower door test |
Home Energy Efficiency Consultants prepares the projected HERS report from your plans, usually in about one business day after the quote is accepted, then does the pre-drywall inspection, blower door and duct leakage tests and the confirmed HERS certificate. See our stretch code report for Arlington permits page for what's in the report, EV-ready and solar-ready rules, and when Phius applies.


Other Approvals You May Need in Arlington
- Zoning Board of Appeals for variances and special permits
- Historical Commission demolition delay (up to 12 months) for significant buildings; Historic Districts Commission in local districts
- Engineering stormwater review; Tree Warden public shade tree rule for new construction
- Demolition sign-offs from Public Works, Fire, Police, Health, Conservation and the Tree Warden
Permit Fees and Timing
Fees: CO for new buildings is a separate $100 application (town portal). Always check the current schedule before you apply.
Review time: Up to 30 days; new buildings usually take close to the full 30 days.
Final Inspection and Certificate of Occupancy
CO after a passed final inspection. The Building Official may require a certified as-built plot plan with height, story, floor area, open space, parking and setback calculations.
For new homes and large additions, the confirmed HERS rating (with passing blower door and duct leakage results) is part of the close-out paperwork. Book the final test before the building inspector's final so the paperwork is ready.
Local rules to know:
- Fossil Fuel Free bylaw in effect since May 21, 2024
- Construction hours: weekdays 8 AM-6 PM; weekends and holidays 9 AM-5 PM
Building Permit FAQ for Arlington
What do you need for a building permit in Arlington, MA?
For a new home or addition: the online application, scaled construction plans, a certified plot plan by a land surveyor, contractor CSL/HIC, insurance and workers' comp paperwork (or a homeowner exemption), any zoning or historic approvals, and energy code compliance documentation. New homes and large additions need a projected HERS rating report.
Do I need a HERS rating for a building permit in Arlington?
For a new home, yes, and also for additions over 1,000 sq ft or more than 100% of the existing home. The rater models your plans for the permit (projected HERS report), then tests the finished house (blower door and duct leakage) for the confirmed HERS rating. Smaller additions and alterations can usually use REScheck or the prescriptive path.
What energy code does Arlington follow?
Arlington's Specialized Code took effect January 1, 2024.
Where do I apply for a building permit in Arlington?
At the Inspectional Services Department, 51 Grove Street, 1st Floor, Arlington, MA 02476 (781-316-3392), through Arlington Online Permitting (OpenGov ViewPoint).
Who can pull a building permit in Arlington?
A homeowner can do work on their own 1-2 family home without a license, but must supervise and attend all inspections. Otherwise a licensed contractor applies.
How much does a building permit cost in Arlington?
CO for new buildings is a separate $100 application (town portal). Check the current fee schedule before you apply.
How long does a building permit take in Arlington?
Up to 30 days; new buildings usually take close to the full 30 days.
Sources and Related Pages
Checked on Arlington's official pages in October 2026. Rules and fees change, so confirm with the building department before you file.
- Arlington Inspectional Services
- Arlington online permitting
- Arlington building bylaws (Title VI)
- Mass.gov: energy code adoption by municipality
Related: Stretch code report for permitting · HERS rating in Arlington · Blower door testing · What triggers a HERS rating. We cover Arlington from our Somerville office at 519 Broadway.
Need the Energy Report for Your Arlington Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.