What You Need for a Building Permit in Newton, MA
To get a building permit in Newton, apply to the Inspectional Services Department (ISD) through NewGov. For a new home or addition you will usually need the application, scaled plans, a surveyor's plot plan, contractor license and insurance paperwork (or a homeowner exemption), a workers' comp affidavit and energy code documentation. Newton follows the Specialized (Opt-In) Energy Code, so new homes and large additions also need a projected HERS rating report from a RESNET-certified rater at permit and a confirmed HERS rating before the certificate of occupancy.
Newton building department
Inspectional Services Department (ISD)
1000 Commonwealth Avenue, Newton, MA 02459
(617) 796-1060
Apply: NewGov (ViewPoint Cloud / OpenGov)
Newton Building Permit Checklist
What Newton asks for on a new home, addition or major renovation, from the Newton permit pages. Bring all of it the first time and the review moves faster.
- Online permit application through NewGov
- Fire Department plan review: every residential and commercial building permit is reviewed by Newton Fire, with floor plans showing smoke and CO detectors (and sprinklers if required)
- Site plan that meets the residential facade build-out ratio (Zoning Ordinance Sec. 1.5.7, effective March 1, 2026); ISD won't accept site plans that don't comply
- Construction plans, cost information and energy code documentation for the project

Who Can Apply and How
Applications are filed online through NewGov. Confirm license and homeowner-permit rules with ISD.
Apply through NewGov (ViewPoint Cloud / OpenGov). Questions go to the Inspectional Services Department (ISD) at (617) 796-1060.
Energy Code Compliance: The Part That Holds Up Most Permits
Newton's Specialized Energy Code applies to complete applications received after January 1, 2024.
At permit: New homes and large additions need a projected HERS rating report. Newton's Fossil Fuel-Free Ordinance (January 1, 2025) requires new construction and major renovations to be all-electric, and from January 1, 2026 additions and renovations over 1,000 sq ft must be fully electric with no gas cooking.
At final: Newton's residential Final Inspection Checklist (revised January 1, 2026) requires a Final HERS Rating, and the city notes mandatory duct leakage testing.
| Project | Energy document |
|---|---|
| New home | Projected HERS report (HERS 42 mixed-fuel / 45 all-electric) |
| ADU | Projected HERS report (HERS 52 / 55) |
| Addition over 1,000 sq ft or over 100% of the home | Projected HERS report (HERS 65 / 70) |
| Smaller addition or alteration | REScheck or the prescriptive path, if the inspector accepts it |
| Commercial up to 20,000 sq ft | COMcheck plus a whole-building blower door test |
Home Energy Efficiency Consultants prepares the projected HERS report from your plans, usually in about one business day after the quote is accepted, then does the pre-drywall inspection, blower door and duct leakage tests and the confirmed HERS certificate. See our stretch code report for Newton permits page for what's in the report, EV-ready and solar-ready rules, and when Phius applies.


Other Approvals You May Need in Newton
- Fire Department review on all permits
- Engineering, Health and all trade inspectors on the permit card, with Building signing last
- Planning (special permit), Conservation, Historical Commission and Tree Warden where applicable
- Newton Historical Commission demolition review for buildings over 50 years old (including partial demolition of 50% of an elevation or roof)
- Historic District Commission for exterior changes in Auburndale, Chestnut Hill, Newton Upper Falls and Newtonville
Permit Fees and Timing
Fees: $20 per $1,000 of estimated cost, rounded up, minimum $50 (fee document updated January 1, 2026). Always check the current schedule before you apply.
Final Inspection and Certificate of Occupancy
Permit card signed by all trades, Engineering, Fire and Health, then Building. Final construction control, contractor and insulation affidavits, final cost affidavit, final as-built plan, FAR and half-story as-built calculations, and the Final HERS Rating.
For new homes and large additions, the confirmed HERS rating (with passing blower door and duct leakage results) is part of the close-out paperwork. Book the final test before the building inspector's final so the paperwork is ready.
Local rules to know:
- Fossil Fuel-Free Ordinance in effect since January 1, 2025
- Residential facade build-out ratio in effect since March 1, 2026
Building Permit FAQ for Newton
What do you need for a building permit in Newton, MA?
For a new home or addition: the online application, scaled construction plans, a certified plot plan by a land surveyor, contractor CSL/HIC, insurance and workers' comp paperwork (or a homeowner exemption), any zoning or historic approvals, and energy code compliance documentation. New homes and large additions need a projected HERS rating report.
Do I need a HERS rating for a building permit in Newton?
For a new home, yes, and also for additions over 1,000 sq ft or more than 100% of the existing home. The rater models your plans for the permit (projected HERS report), then tests the finished house (blower door and duct leakage) for the confirmed HERS rating. Smaller additions and alterations can usually use REScheck or the prescriptive path.
What energy code does Newton follow?
Newton's Specialized Energy Code applies to complete applications received after January 1, 2024.
Where do I apply for a building permit in Newton?
At the Inspectional Services Department (ISD), 1000 Commonwealth Avenue, Newton, MA 02459 ((617) 796-1060), through NewGov (ViewPoint Cloud / OpenGov).
Who can pull a building permit in Newton?
Applications are filed online through NewGov. Confirm license and homeowner-permit rules with ISD.
How much does a building permit cost in Newton?
$20 per $1,000 of estimated cost, rounded up, minimum $50 (fee document updated January 1, 2026). Check the current fee schedule before you apply.
Sources and Related Pages
Checked on Newton's official pages in October 2026. Rules and fees change, so confirm with the building department before you file.
Related: Stretch code report for permitting · HERS rating in Newton · Blower door testing · What triggers a HERS rating. We cover Newton from our Somerville office at 519 Broadway.
Need the Energy Report for Your Newton Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.








