What You Need for a Building Permit in Quincy, MA
To get a building permit in Quincy, apply to the Inspectional Services Department through OpenGov. For a new home or addition you will usually need the application, scaled plans, a surveyor's plot plan, contractor license and insurance paperwork (or a homeowner exemption), a workers' comp affidavit and energy code documentation. Quincy follows the Stretch Energy Code, so new homes and large additions also need a projected HERS rating report from a RESNET-certified rater at permit and a confirmed HERS rating before the certificate of occupancy.
Quincy building department
Inspectional Services Department - Building Department
Public Works Building, 55 Sea St, Quincy, MA 02169
(617) 376-1450
Apply: OpenGov (ViewPoint Cloud) - all permits are online
Quincy Building Permit Checklist
What Quincy asks for on a new home, addition or major renovation, from the Quincy permit pages. Bring all of it the first time and the review moves faster.
- Online building permit application (not issued until approved and paid)
- Debris Removal Form (licensed disposal facility or dumpster company)
- Workers' Compensation Affidavit
- Construction control affidavit and checklist where construction control applies
- Construction Management Plan where required
- Demolition checklist if a building is being taken down

Who Can Apply and How
Applications are filed online. A walk-in Building, Zoning and Conservation clinic for small property owners runs Thursdays at 55 Sea St.
Apply through OpenGov (ViewPoint Cloud) - all permits are online. Questions go to the Inspectional Services Department - Building Department at (617) 376-1450.
Energy Code Compliance: The Part That Holds Up Most Permits
Quincy follows the Stretch Energy Code (adopted 2010, effective July 1, 2011) and is not on the state's Specialized Code list.
At permit: Under the Stretch Code, new homes and additions over 1,000 sq ft (or over 100% of the home) show compliance with a projected HERS rating. Smaller additions can usually use REScheck.
At final: At final we run the blower door and duct leakage tests and issue the confirmed HERS certificate.
| Project | Energy document |
|---|---|
| New home | Projected HERS report (HERS 42 mixed-fuel / 45 all-electric) |
| ADU | Projected HERS report (HERS 52 / 55) |
| Addition over 1,000 sq ft or over 100% of the home | Projected HERS report (HERS 65 / 70) |
| Smaller addition or alteration | REScheck or the prescriptive path, if the inspector accepts it |
| Commercial up to 20,000 sq ft | COMcheck plus a whole-building blower door test |
Home Energy Efficiency Consultants prepares the projected HERS report from your plans, usually in about one business day after the quote is accepted, then does the pre-drywall inspection, blower door and duct leakage tests and the confirmed HERS certificate. See our stretch code report for permitting page for what's in the report, EV-ready and solar-ready rules, and when Phius applies.


Other Approvals You May Need in Quincy
- Zoning Board of Appeals for variances and special permits
- Historical Commission certificate inside the Quincy Center or Adams Birthplace historic districts
- Conservation Commission where applicable
- Engineering, water, sewer, fire, police and health for demolition
Permit Fees and Timing
Fees: City Code: $20 for the first $1,000 of estimated cost plus $12 per additional $1,000. Always check the current schedule before you apply.
Final Inspection and Certificate of Occupancy
A certificate of occupancy is requested through the OpenGov portal, with the final construction control affidavit and the owner's final construction cost affidavit.
For new homes and large additions, the confirmed HERS rating (with passing blower door and duct leakage results) is part of the close-out paperwork. Book the final test before the building inspector's final so the paperwork is ready.
Local rules to know:
- Local historic districts: Quincy Center and Adams Birthplace
Building Permit FAQ for Quincy
What do you need for a building permit in Quincy, MA?
For a new home or addition: the online application, scaled construction plans, a certified plot plan by a land surveyor, contractor CSL/HIC, insurance and workers' comp paperwork (or a homeowner exemption), any zoning or historic approvals, and energy code compliance documentation. New homes and large additions need a projected HERS rating report.
Do I need a HERS rating for a building permit in Quincy?
For a new home, yes, and also for additions over 1,000 sq ft or more than 100% of the existing home. The rater models your plans for the permit (projected HERS report), then tests the finished house (blower door and duct leakage) for the confirmed HERS rating. Smaller additions and alterations can usually use REScheck or the prescriptive path.
What energy code does Quincy follow?
Quincy follows the Stretch Energy Code (adopted 2010, effective July 1, 2011) and is not on the state's Specialized Code list.
Where do I apply for a building permit in Quincy?
At the Inspectional Services Department - Building Department, Public Works Building, 55 Sea St, Quincy, MA 02169 ((617) 376-1450), through OpenGov (ViewPoint Cloud) - all permits are online.
Who can pull a building permit in Quincy?
Applications are filed online. A walk-in Building, Zoning and Conservation clinic for small property owners runs Thursdays at 55 Sea St.
How much does a building permit cost in Quincy?
City Code: $20 for the first $1,000 of estimated cost plus $12 per additional $1,000. Check the current fee schedule before you apply.
Sources and Related Pages
Checked on Quincy's official pages in October 2026. Rules and fees change, so confirm with the building department before you file.
- Quincy Inspectional Services
- Quincy applications and information
- Mass.gov: energy code adoption by municipality
Related: Stretch code report for permitting · HERS rating in Quincy · Blower door testing · What triggers a HERS rating. We cover Quincy from our Everett office at 371 Main St.
Need the Energy Report for Your Quincy Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.








