What You Need for a Building Permit in Woburn, MA
To get a building permit in Woburn, apply to the Inspectional Services Department through CitizenServe Online Permitting Portal. For a new home or addition you will usually need the application, scaled plans, a surveyor's plot plan, contractor license and insurance paperwork (or a homeowner exemption), a workers' comp affidavit and energy code documentation. Woburn follows the Stretch Energy Code, so new homes and large additions also need a projected HERS rating report from a RESNET-certified rater at permit and a confirmed HERS rating before the certificate of occupancy.
Woburn building department
Inspectional Services Department
City Hall Annex, 6 Common Street, Woburn, MA 01801
781-897-5840
Apply: CitizenServe Online Permitting Portal
Woburn Building Permit Checklist
What Woburn asks for on a new home, addition or major renovation, from the Woburn permit pages. Bring all of it the first time and the review moves faster.
- Residential 1-2 family building permit application (one per structure)
- Certified plot plan stamped by a PLS or PE (property lines, setbacks, easements, footprint, utilities, contours, flood plain and wetlands)
- Construction plans to scale: floor plans, elevations, sections, foundation and framing plans (two 11x17 sets, or one paper set plus a PDF)
- Specifications showing Stretch Energy Code compliance, plus a window schedule
- Owner's authorization if an agent applies; Workers' Compensation Insurance Affidavit
- Certification of Treasurer/Collector signed by the owner
- Licensed facility for construction debris

Who Can Apply and How
The application has sections for a licensed Construction Supervisor and a registered HIC. A homeowner who lives or intends to live on the parcel can file without a license; anyone who builds more than one home in two years does not count as a homeowner.
Apply through CitizenServe Online Permitting Portal. Questions go to the Inspectional Services Department at 781-897-5840.
Energy Code Compliance: The Part That Holds Up Most Permits
Woburn adopted the Stretch Code on March 15, 2011, effective January 1, 2012, and is not on the state's Specialized list.
At permit: Woburn's plan standards require specifications showing Stretch Energy Code compliance; for new homes that means a HERS rating report signed by a RESNET-certified rater.
At final: At final we run the blower door and duct leakage tests and issue the confirmed HERS certificate.
| Project | Energy document |
|---|---|
| New home | Projected HERS report (HERS 42 mixed-fuel / 45 all-electric) |
| ADU | Projected HERS report (HERS 52 / 55) |
| Addition over 1,000 sq ft or over 100% of the home | Projected HERS report (HERS 65 / 70) |
| Smaller addition or alteration | REScheck or the prescriptive path, if the inspector accepts it |
| Commercial up to 20,000 sq ft | COMcheck plus a whole-building blower door test |
Home Energy Efficiency Consultants prepares the projected HERS report from your plans, usually in about one business day after the quote is accepted, then does the pre-drywall inspection, blower door and duct leakage tests and the confirmed HERS certificate. See our stretch code report for permitting page for what's in the report, EV-ready and solar-ready rules, and when Phius applies.


Other Approvals You May Need in Woburn
- Public Works for water and sewer connections; Planning for new subdivisions or ANR lots
- Conservation Commission for earth-disturbing work
- Fire, Board of Health and Engineering as checked on the application
- Historical Commission demolition delay for properties 75 years or older
Permit Fees and Timing
Fees: Residential: $15 per $1,000 of estimated construction value, minimum $30 (schedule effective December 20, 2018). Always check the current schedule before you apply.
Review time: Up to 30 days; anywhere from 1 day to 30 days depending on complexity.
Final Inspection and Certificate of Occupancy
For new homes and large additions, the confirmed HERS rating (with passing blower door and duct leakage results) is part of the close-out paperwork. Book the final test before the building inspector's final so the paperwork is ready.
Local rules to know:
- Permits are void six months after issue unless work has started
Building Permit FAQ for Woburn
What do you need for a building permit in Woburn, MA?
For a new home or addition: the online application, scaled construction plans, a certified plot plan by a land surveyor, contractor CSL/HIC, insurance and workers' comp paperwork (or a homeowner exemption), any zoning or historic approvals, and energy code compliance documentation. New homes and large additions need a projected HERS rating report.
Do I need a HERS rating for a building permit in Woburn?
For a new home, yes, and also for additions over 1,000 sq ft or more than 100% of the existing home. The rater models your plans for the permit (projected HERS report), then tests the finished house (blower door and duct leakage) for the confirmed HERS rating. Smaller additions and alterations can usually use REScheck or the prescriptive path.
What energy code does Woburn follow?
Woburn adopted the Stretch Code on March 15, 2011, effective January 1, 2012, and is not on the state's Specialized list.
Where do I apply for a building permit in Woburn?
At the Inspectional Services Department, City Hall Annex, 6 Common Street, Woburn, MA 01801 (781-897-5840), through CitizenServe Online Permitting Portal.
Who can pull a building permit in Woburn?
The application has sections for a licensed Construction Supervisor and a registered HIC. A homeowner who lives or intends to live on the parcel can file without a license; anyone who builds more than one home in two years does not count as a homeowner.
How much does a building permit cost in Woburn?
Residential: $15 per $1,000 of estimated construction value, minimum $30 (schedule effective December 20, 2018). Check the current fee schedule before you apply.
How long does a building permit take in Woburn?
Up to 30 days; anywhere from 1 day to 30 days depending on complexity.
Sources and Related Pages
Checked on Woburn's official pages in October 2026. Rules and fees change, so confirm with the building department before you file.
- Woburn Inspectional Services
- Woburn applications and documents
- Mass.gov: energy code adoption by municipality
Related: Stretch code report for permitting · HERS rating in Woburn · Blower door testing · What triggers a HERS rating. We cover Woburn from our Everett office at 371 Main St.
Need the Energy Report for Your Woburn Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.








