What You Need for a Building Permit in Boston, MA
To get a building permit in Boston, apply to the Inspectional Services Department (ISD), Building Division through ISD online permit portal. For a new home or addition you will usually need the application, scaled plans, a surveyor's plot plan, contractor license and insurance paperwork (or a homeowner exemption), a workers' comp affidavit and energy code documentation. Boston follows the Specialized (Opt-In) Energy Code, so new homes and large additions also need a projected HERS rating report from a RESNET-certified rater at permit and a confirmed HERS rating before the certificate of occupancy.
Boston building department
Inspectional Services Department (ISD), Building Division
1010 Massachusetts Avenue, 5th Floor, Boston, MA 02118
617-635-5300
Apply: ISD online permit portal (Boston Permitting)
Boston Building Permit Checklist
What Boston asks for on a new home, addition or major renovation, from the Boston permit pages. Bring all of it the first time and the review moves faster.
- Online long-form application (subtype Erect/New Construction or Long Form/Alteration) with a full description of work and total estimated cost (labor and materials)
- Stamped design plans drawn to scale by a Massachusetts registered architect or engineer: zoning review needs 2 copies each of the plot plan, stamped elevations showing height and stamped floor plans
- 2 sets of structural, fire protection, electrical, plumbing, HVAC and energy plans for building review
- Certified plot plan by a Massachusetts Registered Land Surveyor (existing and proposed) for new construction and additions
- Contractor license (front and back), certificate of liability insurance, workers' comp affidavit, signed contract with the owner, Site Safety Plan Affidavit and Mattocks-Higgins Affidavit
- Construction cost estimate with breakdown
- Flood Design Affidavit and Flood Elevation Certificate if the lot is in a flood zone
- Fire protection plan and narrative if the project has fire protection

Who Can Apply and How
The licensed contractor doing the work applies in their own name. Owners of an owner-occupied 1-2 family home can pull the permit themselves with the Homeowner Construction License Exemption form and the workers' comp affidavit. HIC registration applies to owner-occupied 1-4 unit homes.
Apply through ISD online permit portal (Boston Permitting). Questions go to the Inspectional Services Department (ISD), Building Division at 617-635-5300.
Energy Code Compliance: The Part That Holds Up Most Permits
Boston adopted the Specialized (Opt-In) Energy Code effective January 1, 2024 (225 CMR 22 and 23).
At permit: ISD asks for energy plans at building review. For a new home or a large addition that means a projected HERS rating report from a RESNET-certified rater.
At final: Boston's certificate of occupancy page says new residential construction and additions over 1,000 sq ft must meet HERS energy standards, and the Building Commissioner reviews HERS compliance before issuing the CO. The CO checklist lists a HERS rating by a RESNET-certified rater.
| Project | Energy document |
|---|---|
| New home | Projected HERS report (HERS 42 mixed-fuel / 45 all-electric) |
| ADU | Projected HERS report (HERS 52 / 55) |
| Addition over 1,000 sq ft or over 100% of the home | Projected HERS report (HERS 65 / 70) |
| Smaller addition or alteration | REScheck or the prescriptive path, if the inspector accepts it |
| Commercial up to 20,000 sq ft | COMcheck plus a whole-building blower door test |
Home Energy Efficiency Consultants prepares the projected HERS report from your plans, usually in about one business day after the quote is accepted, then does the pre-drywall inspection, blower door and duct leakage tests and the confirmed HERS certificate. See our stretch code report for Boston permits page for what's in the report, EV-ready and solar-ready rules, and when Phius applies.


Other Approvals You May Need in Boston
- Zoning review on every project; projects that don't conform go to the Zoning Board of Appeal
- Boston Landmarks Commission for projects in a historic district; Article 85 demolition delay for buildings 50+ years old
- Boston Water & Sewer Commission plan review for new construction
- Public Works for a new curb cut; Parks and Recreation for work within 100 ft of a park or parkway
Permit Fees and Timing
Fees: Long form: $50 plus $10 per $1,000 of estimated cost, paid up front. Certificate of occupancy: $50 filing fee plus 1% of construction cost, trued up at the end. Always check the current schedule before you apply.
Review time: About 4 to 5 weeks for a complete long-form application that needs no zoning or building relief (ISD guide, 2024).
Final Inspection and Certificate of Occupancy
Schedule the final through ISD with the licensed contractor on site. The CO needs all trade sign-offs, an itemized final cost, HERS compliance, a FEMA elevation certificate if in a flood zone and BWSC documents if a water or sewer line was opened. ISD issues the CO within 10 days after inspections pass.
For new homes and large additions, the confirmed HERS rating (with passing blower door and duct leakage results) is part of the close-out paperwork. Book the final test before the building inspector's final so the paperwork is ready.
Local rules to know:
- BERDO emissions rules apply to buildings with 15+ units or 20,000+ sq ft, not to 1-2 family homes
Building Permit FAQ for Boston
What do you need for a building permit in Boston, MA?
For a new home or addition: the online application, scaled construction plans, a certified plot plan by a land surveyor, contractor CSL/HIC, insurance and workers' comp paperwork (or a homeowner exemption), any zoning or historic approvals, and energy code compliance documentation. New homes and large additions need a projected HERS rating report.
Do I need a HERS rating for a building permit in Boston?
For a new home, yes, and also for additions over 1,000 sq ft or more than 100% of the existing home. The rater models your plans for the permit (projected HERS report), then tests the finished house (blower door and duct leakage) for the confirmed HERS rating. Smaller additions and alterations can usually use REScheck or the prescriptive path.
What energy code does Boston follow?
Boston adopted the Specialized (Opt-In) Energy Code effective January 1, 2024 (225 CMR 22 and 23).
Where do I apply for a building permit in Boston?
At the Inspectional Services Department (ISD), Building Division, 1010 Massachusetts Avenue, 5th Floor, Boston, MA 02118 (617-635-5300), through ISD online permit portal (Boston Permitting).
Who can pull a building permit in Boston?
The licensed contractor doing the work applies in their own name. Owners of an owner-occupied 1-2 family home can pull the permit themselves with the Homeowner Construction License Exemption form and the workers' comp affidavit. HIC registration applies to owner-occupied 1-4 unit homes.
How much does a building permit cost in Boston?
Long form: $50 plus $10 per $1,000 of estimated cost, paid up front. Certificate of occupancy: $50 filing fee plus 1% of construction cost, trued up at the end. Check the current fee schedule before you apply.
How long does a building permit take in Boston?
About 4 to 5 weeks for a complete long-form application that needs no zoning or building relief (ISD guide, 2024).
Sources and Related Pages
Checked on Boston's official pages in October 2026. Rules and fees change, so confirm with the building department before you file.
- Boston: how to get a new construction permit
- Boston: how to get a long form permit
- Boston: certificate of occupancy
- Mass.gov: energy code adoption by municipality
Related: Stretch code report for permitting · HERS rating in Boston · Blower door testing · What triggers a HERS rating. We cover Boston from our Everett office at 371 Main St.
Need the Energy Report for Your Boston Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.