What You Need for a Building Permit in Melrose, MA
To get a building permit in Melrose, apply to the Inspectional Services Department through SimpliCity. For a new home or addition you will usually need the application, scaled plans, a surveyor's plot plan, contractor license and insurance paperwork (or a homeowner exemption), a workers' comp affidavit and energy code documentation. Melrose follows the Specialized (Opt-In) Energy Code, so new homes and large additions also need a projected HERS rating report from a RESNET-certified rater at permit and a confirmed HERS rating before the certificate of occupancy.
Melrose building department
Inspectional Services Department
562 Main Street, City Hall Ground Floor, Melrose, MA 02176
781-979-4135
Apply: SimpliCity (MapsOnline) - all applications online
Melrose Building Permit Checklist
What Melrose asks for on a new home, addition or major renovation, from the Melrose permit pages. Bring all of it the first time and the review moves faster.
- Online application with owner, HIC, CSL and the full cost of construction
- Plot plan by a registered land surveyor for new construction and footprint-changing additions (mortgage plans not accepted)
- Design plans with room dimensions, stairs, doors, windows, framing, elevations and foundation details
- Architect affidavit over 35,000 cubic feet
- Stretch energy code compliance report for additions and new structures
- Workers' comp affidavit, licenses, HIC and liability insurance uploaded to the portal
- Smoke detector plans and Engineering I&I fee when adding a bedroom; dumpster permit ($35)

Who Can Apply and How
Owners of 1-2 family homes may get a permit to do the work themselves. Otherwise a licensed construction supervisor applies and must supervise and attend inspections.
Apply through SimpliCity (MapsOnline) - all applications online. Questions go to the Inspectional Services Department at 781-979-4135.
Energy Code Compliance: The Part That Holds Up Most Permits
Melrose is on the state's Specialized Code list; the city says it is a Stretch Code community that has adopted the Specialized Code and uses the 2021 IECC for all reviews.
At permit: Melrose plan reviewers ask for "energy-code compliance documentation demonstrating that the proposed new dwelling complies with the applicable Stretch Code provisions." For a new home that's a projected HERS rating report from a RESNET-certified rater.
At final: At final we run the blower door and duct leakage tests and issue the confirmed HERS certificate.
| Project | Energy document |
|---|---|
| New home | Projected HERS report (HERS 42 mixed-fuel / 45 all-electric) |
| ADU | Projected HERS report (HERS 52 / 55) |
| Addition over 1,000 sq ft or over 100% of the home | Projected HERS report (HERS 65 / 70) |
| Smaller addition or alteration | REScheck or the prescriptive path, if the inspector accepts it |
| Commercial up to 20,000 sq ft | COMcheck plus a whole-building blower door test |
Home Energy Efficiency Consultants prepares the projected HERS report from your plans, usually in about one business day after the quote is accepted, then does the pre-drywall inspection, blower door and duct leakage tests and the confirmed HERS certificate. See our stretch code report for permitting page for what's in the report, EV-ready and solar-ready rules, and when Phius applies.


Other Approvals You May Need in Melrose
- Historic District Commission certificate in the Downtown Historic District
- Conservation Commission near wetlands
- Engineering I&I fee for new bedrooms
- Zoning Board for variances
Permit Fees and Timing
Fees: $15 administrative fee plus $15 per $1,000 for 1-2 family work, minimum $40 (effective July 1, 2023). Always check the current schedule before you apply.
Review time: About 2 to 3 weeks, depending on volume.
Final Inspection and Certificate of Occupancy
Certificate of occupancy application with a room-by-room list, fee paid online, then schedule the building inspector.
For new homes and large additions, the confirmed HERS rating (with passing blower door and duct leakage results) is part of the close-out paperwork. Book the final test before the building inspector's final so the paperwork is ready.
Local rules to know:
- Downtown Historic District
Building Permit FAQ for Melrose
What do you need for a building permit in Melrose, MA?
For a new home or addition: the online application, scaled construction plans, a certified plot plan by a land surveyor, contractor CSL/HIC, insurance and workers' comp paperwork (or a homeowner exemption), any zoning or historic approvals, and energy code compliance documentation. New homes and large additions need a projected HERS rating report.
Do I need a HERS rating for a building permit in Melrose?
For a new home, yes, and also for additions over 1,000 sq ft or more than 100% of the existing home. The rater models your plans for the permit (projected HERS report), then tests the finished house (blower door and duct leakage) for the confirmed HERS rating. Smaller additions and alterations can usually use REScheck or the prescriptive path.
What energy code does Melrose follow?
Melrose is on the state's Specialized Code list; the city says it is a Stretch Code community that has adopted the Specialized Code and uses the 2021 IECC for all reviews.
Where do I apply for a building permit in Melrose?
At the Inspectional Services Department, 562 Main Street, City Hall Ground Floor, Melrose, MA 02176 (781-979-4135), through SimpliCity (MapsOnline) - all applications online.
Who can pull a building permit in Melrose?
Owners of 1-2 family homes may get a permit to do the work themselves. Otherwise a licensed construction supervisor applies and must supervise and attend inspections.
How much does a building permit cost in Melrose?
$15 administrative fee plus $15 per $1,000 for 1-2 family work, minimum $40 (effective July 1, 2023). Check the current fee schedule before you apply.
How long does a building permit take in Melrose?
About 2 to 3 weeks, depending on volume.
Sources and Related Pages
Checked on Melrose's official pages in October 2026. Rules and fees change, so confirm with the building department before you file.
- Melrose permitting guide
- Melrose permit fees
- Melrose Inspection Services
- Mass.gov: energy code adoption by municipality
Related: Stretch code report for permitting · HERS rating in Melrose · Blower door testing · What triggers a HERS rating. We cover Melrose from our Everett office at 371 Main St.
Need the Energy Report for Your Melrose Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.








