What You Need for a Building Permit in Medford, MA
To get a building permit in Medford, apply to the Building Department through Citizenserve. For a new home or addition you will usually need the application, scaled plans, a surveyor's plot plan, contractor license and insurance paperwork (or a homeowner exemption), a workers' comp affidavit and energy code documentation. Medford follows the Specialized (Opt-In) Energy Code, so new homes and large additions also need a projected HERS rating report from a RESNET-certified rater at permit and a confirmed HERS rating before the certificate of occupancy.
Medford building department
Building Department
85 George P. Hassett Drive, City Hall Room 115A, Medford, MA 02155
(781) 393-2509
Apply: Citizenserve (applications must be filed online)
Medford Building Permit Checklist
What Medford asks for on a new home, addition or major renovation, from the Medford permit pages. Bring all of it the first time and the review moves faster.
- Online building permit application, every form completed
- Three sets of plans (the building official may adjust by scope)
- Plot plan prepared by a registered professional land surveyor (a mortgage plan usually isn't enough)
- Workers' Compensation Insurance Affidavit
- Contractor license registration with the City plus a driver's license
- Energy code documentation for new homes and large additions

Who Can Apply and How
Only the owner of a 1-2 family home who lives there can get a homeowner permit. Contractors should hold a CSL, HIC registration (owner-occupied 1-4 family) and workers' comp, and must register their licenses with the City.
Apply through Citizenserve (applications must be filed online). Questions go to the Building Department at (781) 393-2509.
Energy Code Compliance: The Part That Holds Up Most Permits
Medford is on the state's Specialized Code list.
At permit: New homes and large additions need a projected HERS rating report. Medford also offers an optional expedited Clean Energy Consolidated Local Permit.
At final: At final we run the blower door and duct leakage tests and issue the confirmed HERS certificate. Medford posts a Final Cost Affidavit form for close-out.
| Project | Energy document |
|---|---|
| New home | Projected HERS report (HERS 42 mixed-fuel / 45 all-electric) |
| ADU | Projected HERS report (HERS 52 / 55) |
| Addition over 1,000 sq ft or over 100% of the home | Projected HERS report (HERS 65 / 70) |
| Smaller addition or alteration | REScheck or the prescriptive path, if the inspector accepts it |
| Commercial up to 20,000 sq ft | COMcheck plus a whole-building blower door test |
Home Energy Efficiency Consultants prepares the projected HERS report from your plans, usually in about one business day after the quote is accepted, then does the pre-drywall inspection, blower door and duct leakage tests and the confirmed HERS certificate. See our stretch code report for permitting page for what's in the report, EV-ready and solar-ready rules, and when Phius applies.


Other Approvals You May Need in Medford
- Weekly multi-department development meeting for new buildings and major projects
- Conservation Commission (Notice of Intent) for work near wetlands, the 100-ft buffer or 200-ft Riverfront Area, before the building permit
- Historical Commission demolition review for buildings over 75 years old
- Historic District Commission in the South Street Historic District
Permit Fees and Timing
Fees: $15 per $1,000 of estimated cost plus a $35 application fee; new residential plan review $100 (city's posted schedule). Always check the current schedule before you apply.
Review time: The building official has 30 days to act; most reviews are faster.
Final Inspection and Certificate of Occupancy
For new homes and large additions, the confirmed HERS rating (with passing blower door and duct leakage results) is part of the close-out paperwork. Book the final test before the building inspector's final so the paperwork is ready.
Local rules to know:
- South Street Historic District
Building Permit FAQ for Medford
What do you need for a building permit in Medford, MA?
For a new home or addition: the online application, scaled construction plans, a certified plot plan by a land surveyor, contractor CSL/HIC, insurance and workers' comp paperwork (or a homeowner exemption), any zoning or historic approvals, and energy code compliance documentation. New homes and large additions need a projected HERS rating report.
Do I need a HERS rating for a building permit in Medford?
For a new home, yes, and also for additions over 1,000 sq ft or more than 100% of the existing home. The rater models your plans for the permit (projected HERS report), then tests the finished house (blower door and duct leakage) for the confirmed HERS rating. Smaller additions and alterations can usually use REScheck or the prescriptive path.
What energy code does Medford follow?
Medford is on the state's Specialized Code list.
Where do I apply for a building permit in Medford?
At the Building Department, 85 George P. Hassett Drive, City Hall Room 115A, Medford, MA 02155 ((781) 393-2509), through Citizenserve (applications must be filed online).
Who can pull a building permit in Medford?
Only the owner of a 1-2 family home who lives there can get a homeowner permit. Contractors should hold a CSL, HIC registration (owner-occupied 1-4 family) and workers' comp, and must register their licenses with the City.
How much does a building permit cost in Medford?
$15 per $1,000 of estimated cost plus a $35 application fee; new residential plan review $100 (city's posted schedule). Check the current fee schedule before you apply.
How long does a building permit take in Medford?
The building official has 30 days to act; most reviews are faster.
Sources and Related Pages
Checked on Medford's official pages in October 2026. Rules and fees change, so confirm with the building department before you file.
- Medford Building Department
- Medford Conservation Commission
- Mass.gov: energy code adoption by municipality
Related: Stretch code report for permitting · HERS rating in Medford · Blower door testing · What triggers a HERS rating. We cover Medford from our Somerville office at 519 Broadway.
Need the Energy Report for Your Medford Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.








