⚡ Same-Day HERS Ratings — Fast turnaround & 24/7 support across Massachusetts 📞 (617) 501-6788 Free Quote

68 South St - Framingham MA

MA 01702

Energyconsultants01@gmail.com

Business Hr. 08:00-08:30

+1 (617) 501-6788

24/7 Support

ADU Energy Code and HERS Requirements in Massachusetts (2026)
Massachusetts accessory dwelling units

ADU Building Permit and Energy Code Requirements in Massachusetts

Since February 2, 2025, Massachusetts zoning lets one accessory dwelling unit (up to 900 sq ft or half the main house, whichever is smaller) be built by right in single-family districts (M.G.L. c.40A s.3). Zoning got easier, but the building and energy code still apply: under the Stretch and Specialized codes an ADU needs a HERS rating of 52 or less if mixed-fuel or 55 or less if all-electric.

Code sections citedChecked October 2026RESNET-certified HERS rater

ADU HERS targets

Mixed-fuel 52, all-electric 55, solar electric 55, solar plus all-electric 58 (Table R406.5). The existing house is not included in the ADU's rating.

900 sq ftBy-right ADU cap
HERS 52/55ADU target

What the ADU Law Changed

  • An ADU is a self-contained unit with its own sleeping, cooking and sanitary facilities and a separate entrance, no larger than half the main house or 900 sq ft, whichever is smaller (M.G.L. c.40A s.1A).
  • Towns can't prohibit, unreasonably restrict or require a special permit for one ADU in a single-family zoning district (c.40A s.3).
  • Towns can't require owner occupancy, and can require no more than one extra parking space (none within half a mile of transit).
  • State regulations (760 CMR 71.00, "Protected Use ADUs") took effect January 31, 2025, and don't override the building code.

ADU Energy Code Targets

From Table R406.5 of 225 CMR 22 (Stretch Code) and Appendix RC (Specialized Code).

ADU typeMax HERS
Mixed-fuel52
Solar electric55
All-electric55
Solar + all-electric58

DOER's 2025 training slides apply the 52-58 range to both stand-alone ADUs and ADUs attached to an existing house, and note that the existing house is not included in the ADU's HERS rating. ADUs still need a blower door test, duct testing, ventilation and the other mandatory items.

Diagram of four ADU types: extension, detached, split or nested

ADU Permit Checklist

  • Building permit application, scaled plans and a certified site plan showing setbacks.
  • Many towns run ADUs through site plan review (for example Malden) or publish an ADU guide (for example Dedham).
  • Utility capacity: sewer and water permits for added flow in some towns (for example Dedham).
  • Energy code documentation: projected HERS report for the ADU, then the confirmed rating at final.
  • Fossil-fuel-free towns may require the ADU to be all-electric.

If an ADU is created by converting space inside an existing house, ask us early: the energy path can follow the alteration rules instead, and the building inspector decides.

FAQ

Do ADUs need a HERS rating in Massachusetts?

Under the Stretch and Specialized codes, yes: Table R406.5 sets ADU targets of HERS 52 mixed-fuel and 55 all-electric (55 solar electric, 58 solar plus all-electric).

How big can a by-right ADU be in Massachusetts?

Up to half the gross floor area of the main house or 900 sq ft, whichever is smaller (M.G.L. c.40A s.1A).

When did the Massachusetts ADU law take effect?

The by-right ADU provisions took effect February 2, 2025, and the 760 CMR 71.00 regulations took effect January 31, 2025.

Is the main house included in an ADU's HERS rating?

No. DOER's 2025 Stretch Code slides say the existing house is separate from an attached ADU and is not included in the HERS rating.

Does the ADU law override the building code?

No. The zoning protection doesn't change the building code; the ADU still needs a building permit and energy code compliance.

Building an ADU? Get the HERS Report Early

Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.

The Phius Certified Verifier logo is used under license from Phius.

25+Years Experience
15,000+HERS Ratings
2,000+Units Completed
250+New Construction Builds
1365★ Google Reviews
✓ Unrestricted CSL License #CS-116975✓ RESNET Certified HERS Rater✓ Mass Save®-Listed HERS Rater

Certifications

certified home energy rater
International Code Council - ICC Membership Badge
Certified Home Energy Rater - RESNET HERS rater certification badge
Phius Certified Verifier logo - Home Energy Efficiency Consultants, Phius Passive House verification in Massachusetts

Stay Updated with Our Latest News

Sign up for our newsletter to receive exclusive updates, tips, and insights about energy-efficient building practices, financial incentives, and the latest energy code requirements in Massachusetts.

You have been successfully Subscribed! Ops! Something went wrong, please try again.

At Home Energy Efficiency Consultants, we are committed to providing the highest quality energy consulting services to homebuilders, architects, and developers across Massachusetts.

Contact Details

+1 (617) 501-6788

24/7 Support

68 South St - Framingham MA

MA 01702

Energyconsultants01@gmail.com

Business Hr. 08:00-08:30

© 2026, All Rights Reserved.

The Phius Certified Verifier logo is used under license from Phius.

Home Energy Efficiency Consultants — 4 Massachusetts Locations — (617) 501-6788519 Broadway, Somerville, MA 02145  •  68 South St, Framingham, MA 01702  •  272 Lincoln St C1, Marlborough, MA 01752  •  371 Main St, Everett, MA 02149
ENERGY STAR PartnerU.S. Department of Energy Efficient New Home Partner verified listingENERGY STAR® Partner  ·  U.S. DOE Efficient New Home Partner — Verified  ·  Mass Save®-Listed HERS Rater
Statewide service: HERS Ratings Massachusetts — Home Energy Efficiency Consultants
⚡

Before you go — get a free quote

Same-day HERS ratings & blower door testing across Massachusetts. We respond within hours.

Get My Free Quote →