EV-Ready Requirements for New Construction in Massachusetts
Under the Massachusetts Stretch and Specialized codes, new one- and two-family homes and townhouses need at least one 50-amp branch circuit per dwelling for Level 2 charging, labeled "EV READY" and ending within 6 ft of the parking space (225 CMR 22 R404.4). Other residential buildings need 20% of parking spaces on a 40-amp, 208/240-volt circuit, and commercial buildings follow C405.13.
The short version
1-2 family and townhouses: one 50-amp circuit per home. Multifamily: 20% of spaces at 40 amps. Commercial: 20% (R and B occupancies) or 10% (others).
Residential EV-Ready Rules (R404.4)
| Building | Requirement |
|---|---|
| One- and two-family homes and townhouses | At least one 50-amp branch circuit per dwelling unit for Level 2 charging |
| Other residential (R-use) buildings | At least 20% of installed spaces on a 40-amp, 208/240-volt circuit (9.6 kVA minimum) |
- Label the circuit "EV READY" in the panel directory and at the termination point.
- End in a NEMA receptacle or an SAE J1772 / J3400 connector within 6 ft of each EV-ready space.
- Size and install per the Massachusetts Electrical Code.

Exceptions
- You never need more EV-ready spaces than parking spaces installed.
- Met if all non-EV-ready spaces are separated from the premises by a public right-of-way.
- R-1 and R-2 multifamily may follow the commercial C405.13 rules instead.
- Each required Level 2 space can be replaced by three Level 1 spaces on 20-amp, 120-volt circuits.
Commercial EV-Ready (C405.13)
New parking spaces in commercial buildings need EV-ready spaces per Table C405.13: at least 20% for Group R and B occupancies and 10% for others, each on a 40-amp or larger dedicated circuit (or a circuit with an automatic load management system). EV-ready locations go on the construction documents (C103.2).
How It Fits the Rest of Your Permit
EV-ready wiring is one of the items we flag in the stretch code report along with the solar-ready zone, ventilation and the HERS target. See also solar-ready zone requirements.
FAQ
Is EV-ready wiring required for new homes in Massachusetts?
Yes in Stretch and Specialized Code communities: 225 CMR 22 R404.4 requires at least one 50-amp branch circuit per one- or two-family dwelling or townhouse.
How far can the EV-ready outlet be from the parking space?
The circuit must end within 6 ft of each EV-ready space.
Does a multifamily building need EV chargers in every space?
No. At least 20% of installed spaces need a 40-amp, 208/240-volt EV-ready circuit; R-1 and R-2 buildings may use the commercial rules instead.
Can I use Level 1 instead of Level 2?
Yes, at a ratio of at least three Level 1 spaces (20-amp, 120-volt) for each required Level 2 space.
What do commercial buildings need?
C405.13: 20% of new parking spaces for Group R and B occupancies, 10% for others, each on a 40-amp or larger circuit.
Town-by-Town Permit Checklists
Local building department details, checked on each town's own website:
Sources: 225 CMR 22 (residential) · 225 CMR 23 (commercial) · Mass.gov residential Stretch/Specialized summary. Code text current as of October 2026; DOER has proposed updates to the Stretch and Specialized codes, so confirm before you file.
Related: Stretch code report for permitting · What triggers a HERS rating · REScheck and COMcheck · Phius verification
Want Your EV-Ready Plan Checked Before Permit?
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.
Last updated · Home Energy Efficiency Consultants, RESNET-certified HERS raters








