⚡ Same-Day HERS Ratings — Fast turnaround & 24/7 support across Massachusetts 📞 (617) 501-6788 Free Quote

68 South St - Framingham MA

MA 01702

Energyconsultants01@gmail.com

Business Hr. 08:00-08:30

+1 (617) 501-6788

24/7 Support

New Home Building Permit Requirements in Massachusetts (2026)
Massachusetts new construction

Massachusetts Building Permit Requirements for a New Home

To build a new 1-2 family home in Massachusetts you file a permit application with the local building department under the 10th Edition State Building Code (780 CMR). Expect to submit two or more sets of construction documents, a site plan from a boundary survey, the construction supervisor or homeowner information, a workers' comp affidavit, a debris disposal location and energy code documentation. In Stretch and Specialized Code towns, the energy documentation is a projected HERS rating report.

Code sections citedChecked October 2026RESNET-certified HERS rater

The short list

Application, plans (2+ sets), surveyed site plan, CSL or homeowner exemption, workers' comp affidavit, debris disposal facility, energy code report, and any zoning, conservation or historic approvals.

30 daysBuilding official must act
180 daysTo start work after issue

The Statewide Checklist (780 CMR 10th Edition)

The 10th Edition became the only building code in effect on July 1, 2025. Chapter 51, the Massachusetts Residential Code, adopts the 2021 IRC with state amendments.

  • Permit application filed by the owner or authorized agent on the building department's form (R105.3).
  • Construction documents in two or more sets (R107.1), with structural details and any stamped engineering for engineered lumber or steel.
  • Site plan drawn to scale from an accurate boundary line survey (R107.2.9). Most towns want it certified by a registered land surveyor.
  • Construction Supervisor License name, signature, number and category (110.R5.2.16), or the homeowner exemption.
  • Workers' Compensation Insurance Affidavit (M.G.L. c.152 s.25C). Homeowners doing all the work check the homeowner box.
  • Debris disposal: the permit must name the licensed facility where construction debris goes (M.G.L. c.40 s.54).
  • Energy code documentation: a projected HERS rating report in Stretch and Specialized towns; REScheck or a HERS rating in base-code towns.
  • Local approvals: zoning, conservation, historic, fire, board of health, DPW and stormwater sign-offs as your town requires.
Construction plan set for a Massachusetts new home building permit

Who Can Pull the Permit

Work regulated by the building code has to be supervised by a licensed Construction Supervisor (780 CMR 110.R5). The license types are the unrestricted CSL, the CSL for one- and two-family dwellings, and specialty licenses.

A homeowner who owns the lot and lives (or will live) in the 1-2 family home is exempt from licensing, but must act as supervisor if they hire others. A person who builds more than one home in two years is not considered a homeowner. The exemption can't be used for manufactured or modular homes.

HIC registration (M.G.L. c.142A) covers work on existing owner-occupied 1-4 unit homes, so it matters for additions and renovations rather than a brand-new house.

The Energy Code Part

This is the item most new-home permits get stuck on.

Town energy codeWhat goes in with the permitNew home target
Specialized (60 towns)Projected HERS report; all-electric, mixed-fuel with solar and electric-ready wiring, or zero energyHERS 45 all-electric / 42 mixed-fuel; homes over 4,000 sq ft all-electric or zero energy
Stretch (242 towns)Projected HERS report (or Passive House)HERS 45 all-electric / 42 mixed-fuel
Base codeREScheck/prescriptive or a HERS ratingPrescriptive tables or the ERI path

Town counts are from mass.gov as of June 4, 2026. New homes also need a blower door test (3.0 ACH50), duct leakage testing, mechanical ventilation, EV-ready wiring (R404.4) and a solar-ready zone (Appendix RB) where they apply. See what goes in a stretch code report.

Sample projected HERS rating certificate for a Massachusetts new home permit

Timeline and Certificate of Occupancy

  • The building official must issue or deny the permit in writing within 30 days of filing (R105.3.1).
  • A permit becomes invalid if work doesn't start within 180 days of issue (R105.5).
  • No new home may be occupied until the building official issues a Certificate of Occupancy and Use (R111.1), which is issued within 10 days after a passing inspection (R111.2).
  • For new homes in Stretch and Specialized towns, the confirmed HERS rating with blower door and duct leakage results is part of the close-out paperwork.

FAQ

What do I need for a building permit for a new house in Massachusetts?

A permit application, two or more sets of construction documents, a site plan based on a boundary survey, the Construction Supervisor License (or homeowner exemption), a workers' comp affidavit, the licensed debris disposal facility, energy code documentation and any local zoning, conservation or historic approvals.

How long does the building department have to issue a permit in Massachusetts?

Under 780 CMR R105.3.1 the building official must issue or deny the permit in writing within 30 days of filing.

Can a homeowner pull a building permit for a new house in Massachusetts?

Yes, if they own the lot and live or intend to live in the 1-2 family home, and they act as supervisor. Someone who builds more than one home in two years is not considered a homeowner.

Do I need a HERS rating to build a new house in Massachusetts?

In the 242 Stretch Code and 60 Specialized Code communities, yes: a projected HERS report at permit and a confirmed rating at the end. In base-code towns a HERS rating is one of the compliance options.

How long is a Massachusetts building permit good for?

It becomes invalid if work does not begin within 180 days after it is issued (780 CMR R105.5).

Need the Energy Report for Your New Home Permit?

Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.

The Phius Certified Verifier logo is used under license from Phius.

25+Years Experience
15,000+HERS Ratings
2,000+Units Completed
250+New Construction Builds
1365★ Google Reviews
✓ Unrestricted CSL License #CS-116975✓ RESNET Certified HERS Rater✓ Mass Save®-Listed HERS Rater

Certifications

certified home energy rater
International Code Council - ICC Membership Badge
Certified Home Energy Rater - RESNET HERS rater certification badge
Phius Certified Verifier logo - Home Energy Efficiency Consultants, Phius Passive House verification in Massachusetts

Stay Updated with Our Latest News

Sign up for our newsletter to receive exclusive updates, tips, and insights about energy-efficient building practices, financial incentives, and the latest energy code requirements in Massachusetts.

You have been successfully Subscribed! Ops! Something went wrong, please try again.

At Home Energy Efficiency Consultants, we are committed to providing the highest quality energy consulting services to homebuilders, architects, and developers across Massachusetts.

Contact Details

+1 (617) 501-6788

24/7 Support

68 South St - Framingham MA

MA 01702

Energyconsultants01@gmail.com

Business Hr. 08:00-08:30

© 2026, All Rights Reserved.

The Phius Certified Verifier logo is used under license from Phius.

Home Energy Efficiency Consultants — 4 Massachusetts Locations — (617) 501-6788519 Broadway, Somerville, MA 02145  •  68 South St, Framingham, MA 01702  •  272 Lincoln St C1, Marlborough, MA 01752  •  371 Main St, Everett, MA 02149
ENERGY STAR PartnerU.S. Department of Energy Efficient New Home Partner verified listingENERGY STAR® Partner  ·  U.S. DOE Efficient New Home Partner — Verified  ·  Mass Save®-Listed HERS Rater
Statewide service: HERS Ratings Massachusetts — Home Energy Efficiency Consultants
⚡

Before you go — get a free quote

Same-day HERS ratings & blower door testing across Massachusetts. We respond within hours.

Get My Free Quote →