ERV Requirements for New Homes in Boston, MA
New homes in Boston need continuously operating balanced ventilation with heat or energy recovery: an ERV or HRV (225 CMR 22 R403.6 and R403.6.1). Boston adopted the Specialized (Opt-In) Energy Code effective January 1, 2024 (225 CMR 22 and 23). Units of 300 cfm or less need a sensible recovery efficiency of at least 65% at 32°F, and the installed airflow must be tested by a HERS rater or BPI professional before final sign-off (R403.6.3).
For Boston permits
Show the ERV/HRV model, design airflow and duct layout on the plans. At final, the Inspectional Services Department expects the HERS rater’s ventilation test with the energy paperwork.
What Boston Requires
| Item | Requirement |
|---|---|
| Energy code | Specialized (Opt-In) Code (225 CMR 22). Boston adopted the Specialized (Opt-In) Energy Code effective January 1, 2024 (225 CMR 22 and 23). |
| System type | Continuous balanced ventilation with heat or energy recovery (ERV or HRV), R403.6.1 |
| Efficiency | SRE of 65% or more at 32°F for units of 300 cfm or less, HVI-listed |
| Noise | Whole-house fans 1.0 sone or quieter (R403.6.5) |
| Outdoor intake | At least 10 ft from plumbing vents and similar sources; screened; no air from an unconditioned basement (R403.6.7) |
| Testing | Airflow verified by a HERS rater, HERS Rating Field Inspector or BPI professional (R403.6.3) |
| Building department | Inspectional Services Department (ISD), Building Division, 1010 Massachusetts Avenue, 5th Floor, Boston, MA 02118, 617-635-5300 |
Full code walk-through: ERV/HRV requirements in Massachusetts.
Why Proper Ventilation Matters in a Tight Boston Home
Today’s code-built homes are sealed tight and tested with a blower door. That saves energy, but the old leaks that used to air a house out are gone. Without working mechanical ventilation, everything made inside stays inside.
- Moisture: showers, cooking, breathing and drying new framing and drywall add water vapor every day. The EPA recommends keeping indoor humidity below 60%, ideally 30–50%. Above that, windows sweat and mold can start.
- Indoor air quality: CO2, cooking smoke, and chemicals off-gassing from new finishes, cabinets and flooring build up in a sealed house.
- Comfort and health: steady fresh air in bedrooms and living areas, without opening windows in January.
- The building itself: controlled humidity protects framing, insulation and finishes from hidden condensation.
That is why Massachusetts requires continuous, balanced ventilation with heat or energy recovery in new homes, and why it has to be tested before final.
How an ERV Works

- Two fans run continuously: one brings fresh outdoor air in, the other pulls stale air out of kitchens, baths and laundry.
- Both airstreams pass through the core side by side but never mix.
- In winter the warm outgoing air pre-warms the cold incoming air, so you get fresh air without a big heating penalty (code requires 65%+ sensible recovery).
- In summer an ERV also moves some humidity from the incoming air to the outgoing stream. An HRV recovers heat only.
Choosing between them? See ERV vs. HRV.
Why Proper Balancing Is So Important

In a tight house, even a small mismatch between supply and exhaust changes the pressure of the whole home:
- Too much exhaust (negative pressure): the house pulls replacement air through walls, the garage and the basement, which can bring in dust, fumes and soil gases, and can backdraft fuel-burning appliances.
- Too much supply (positive pressure): warm, moist indoor air is pushed into wall and attic cavities in winter, where it can condense and grow mold.
- Wrong total airflow: too little leaves stale, humid air; too much wastes energy and dries the house out in winter.
We measure supply and exhaust with a calibrated flow hood or flow grid, adjust with your HVAC contractor until they match the design rate, and document it for the inspector. See ventilation testing and balancing.
How Much Airflow a Boston Home Needs
Massachusetts sets the minimum continuous rate from floor area, bedrooms and the blower door result: Q = 0.03 × floor area + 7.5 × (bedrooms + 1) − 0.052 × Q50 × S × WSF. The tighter the house tests, the more mechanical ventilation it needs.
See the ventilation CFM calculation and ventilation testing and balancing.

Common Boston ERV Problems We Find at Final
- ERV left on factory speed, far off the design airflow.
- Supply and exhaust out of balance, pushing the house positive or negative.
- Intake too close to a dryer or plumbing vent.
- System switched off or set to intermittent, so moisture builds up. See moisture and mold in tight homes.
More for Boston Projects
- HERS rating in Boston
- What you need for a building permit in Boston
- Stretch code help in Boston
- Manual J, S and D for equipment sizing
- ERV vs. HRV
We serve Boston from our Everett office at 371 Main St.
FAQ
Is an ERV required for new homes in Boston?
Yes. Boston follows the Specialized (Opt-In) Code, which requires balanced ventilation with heat or energy recovery (an ERV or HRV) in new homes under 225 CMR 22 R403.6.1.
Can I use an HRV instead of an ERV in Boston?
Yes. Either meets code if the unit is HVI-listed with a sensible recovery efficiency of at least 65% at 32°F.
Who tests the ERV for the Boston building department?
A HERS rater, HERS Rating Field Inspector or BPI professional measures the installed airflow (R403.6.3). We usually do it during the final HERS inspection.
How do I know how many CFM my Boston home needs?
It depends on floor area, bedrooms and the blower door result. We calculate it from your plans and confirm it at final.
Do additions in Boston need an ERV?
Large additions and major renovations that trigger a HERS rating must meet the mandatory ventilation items. Small additions usually follow component rules; ask us about your project.
Town-by-Town Permit Checklists
Local building department details, checked on each town's own website:
Sources: 225 CMR 22 (Stretch/Specialized residential) · Mass.gov energy code adoption by municipality · Boston: how to get a new construction permit. Code text current as of October 2026; DOER has proposed updates to the Stretch and Specialized codes, so confirm before you file.
Related: Stretch code report for permitting · What triggers a HERS rating · REScheck and COMcheck · Phius verification
Building in Boston? Get Your Ventilation Designed and Tested
Send your plans today. Most projected HERS reports are ready in about one business day after the quote is accepted.
Mass Save®-Listed HERS Rater
Trusted Partner — Verified
Partner
Passive House Verifier
Member★★★★★136 Google
Reviews
The Phius Certified Verifier logo is used under license from Phius.








